Back
Completion dual taxiway system

Completion dual taxiway system

Taxiway Q

Study
Planning
18SEP2018
Implementation
31DEC2021 - 31DEC2023
Evaluation

Schiphol is equipped with a circumferential double-lane taxiway system, except for the current Quebec taxiway. Schiphol and its partners will increase operational predictability, uniformity and ground capacity by doubling the Quebec taxiway. This will reduce the likelihood of on-ground safety occurrences. The double taxiway will be integrated in the clockwise and counter-clockwise routing of the Alpha and Bravo taxiways.

Opposite traffic in SW corner – with (right) and without (left) dual taxiway Q

Opposite traffic in SW corner – with (right) and without (left) dual taxiway Q

Doubling of the Quebec Taxiway

Congestion in SW corner – With (right) and without (left) dual taxiway Q

Back to introduction